Specifications
Argonaut Technologies 
Revision  06/24/98 
- 
ASWM Interface 
Harness connection 
1 
Lower Manifold 
Pressure connection (port 
6) 
Figure 
3 
- 
ASW Controller Unit Front View 
The remaining connection that differentiates the ASW Controller Unit from the standard 
Controller Unit is an additional port on the front panel.  In figure 
3 
this port is labeled "Lower 
Manifold Pressure connection (Port 6)".  Locate the tubing labeled "MEM"  in the Reactor Unit 
Umbilicus.  If the "MEW tubing already has 
a 
ferrule and fitting attached, identical to tubing one 
through five, then continue with step 
7. 
If no fitting or ferrule is attached to the "MEM"  tubing 
continue with step 
6. 
Slide the fitting (Part Number  100019) on the "MEW tubing with the threads closest to the end 
of the tubing.  Slide the yellow ferrule (Part Number 100020) onto the tubing so that the smaller 
OD is closest to the threads of the fitting. Align the flat edge of the ferrule to the end of the 
"MEM"  tubing. Create a ferrule swaging tool by screwing the 
%-28 plug into the %-28 union 
(Part Numbers 100083 and  100200) included with the Automated Solvent Wash Option.  Screw 
the "MEM"  fitting into the ferrule swaging tool. Tighten the fitting finger tight and continue for 
?4 
turn.  Remove the fitting from the swaging tool, you will notice the surface of the ferrule 
closest to the fitting will be slightly flattened. 
Connect the "MEM" tubing with ferrule and fitting into port 6 on the ASW Controller's front 
panel. Make the connection finger tight. Complete the remaining tubing and cable connections 
from the Reactor Unit Umbilicus to the ASW Controller Unit. These connections are identical to 
the standard Quest and are described in the Quest User Manual. 
See Figure 4 for the location of the ports on the front of the ASWM. Connect the BTL PRESS 
line from the Reactor Unit Umbilicus to the Bottle Pressure port on the front of the ASWM. 
Connect the SOLVENT line from the Reactor Unit umbilicus to the SOLVENT port on the front 
of the ASWM. Connect one end of the 0.125 inch OD Teflon tubing with fittings (Part Number 
300462) to the VENT port on the front of the ASWM and the other end to the UTILITY 2 port on 
top of the Reactor Unit. Use the two hose clamps (Part Number 
1 
O2559)to hold the vent tubing 
tightly to the Umbilicus. 
ASWM Interface Harness 
d 
A  B 
C 
D 
Purge 
Bottle Pressure 
1111 
1 
0 
Vent 
\ 
Solvent 
Toggle Valves 
Figure 
4 
- 
Automated Solvent Wash Module (ASWM) Front Panel 
Artisan Technology Group - Quality Instrumentation ... Guaranteed | (888) 88-SOURCE | www.artisantg.com










