Specifications
Drain
I
Figure
2.
Quest
210
Reactor Unit
Installation
of
an Oil Bubbler and Purging the System
-
This synthesis requires an oil bubbler be installed in the Utility 1 port located at the top of
the instrument
(Figure
3).
Use 118 inch Teflon tubing to connect the oil bubbler to the
-
Quest 21
0.
The bubbler outlet should be pointed towards the back of the fume hood and
away from the Quest. Fittings are provided with the Quest to interface with an oil
-
bubbler, or
any
other external accessory. These fittings have a !A"-28 thread.
Argonaut Technologies
Part
Number 102298
04/02/98
Quest Tutorial
Artisan Technology Group - Quality Instrumentation ... Guaranteed | (888) 88-SOURCE | www.artisantg.com










