Specifications
GRCM
INSTALLATION
'
Overview
,A
Caution
Do not use corrosive gases, e.g., hydrogen chloride, ammonia,
or ozone with the GRCM. Using corrosive gases will damage
the GRCM and void the warranty.
OVERVIEW
11111111l11111l1111IIIIlIIII1IIIIIIIIIIslllItlllllll
The
Control Box
fits neatly on the top of the Quest controller. It must
be placed within four feet of the external reagent gas tank, and within four
feet of the Quest
210
Reactor.
The control box has two gas inputs:
Input
1
is the inert gas input which connects to the Quest controller
using the supplied "T" and Teflonm tubing.
Input
2
is the reagent gas input which connects to a user-provided
regulator. We recommend using a regulator designed for low pressure,
allowing no more than
30
psig
(3.08
barr) for reagent gases.
The Gas Delivery Manifold
is installed onto the lower manifold
hers of the Quest reactor and receives gas from the GRCM Control box.
The Solvent Trap Manifold
is installed onto the upper manifold of
the Quest reactor. It combines the gas used for product concentration from
each reaction vessel and diverts it to the Solvent Trap Manifold outlet for
trapping and reclaiming.
GRCM
-
User
Manual
Artisan Technology Group - Quality Instrumentation ... Guaranteed | (888) 88-SOURCE | www.artisantg.com










