Specifications

GRCM
INSTALLATION
'
Installation Steps
,
3.
Attach the end of that line to side
B
of the
"T"
(Part number 101955) and
make it finger-tight.
4.
lnsert one end of the lnert Gas Extension Line (Part number 300797) into
side
A
of the
"T"
and make finger-tight. lnsert the other end of the line into
port #3 of the Quest controller and make finger-tight.
5.
Attach one end of the lnert Gas Inlet Line (Part number 300795) to side
C
of
the
"T".
Connect the other end to input 1 of the GRCM Control box. See
Figure 3 below.
6.
lnsert the 118 inch PEEK fitting of the reagent gas inlet line (Part number
300796) to input
#2
of the Control box and make finger-tight. Connect the
compression fitting on the other end of this Teflon tubing to the outlet of
the reagent gas regulator. Do not set the regulator above 30 psig (3.08
barr).
See Figure 3 below.
Figure
3:
Control Box showing Gas Connections
1
and
2
GRCM
-
User
Manual
Artisan Technology Group - Quality Instrumentation ... Guaranteed | (888) 88-SOURCE | www.artisantg.com