Specifications
Gas 
Delivery 
Manifold 
1. 
Connect one end of the Gas Delivery Manifold line (Part number 
300794) 
to 
the outlet of the GRCM control box. Connect the other end to the inlet port 
of the Gas Delivery Manifold. Install a plug on the other outlet of the GRCM 
Control Box if it is not being used. 
2. 
Push in the two buttons on the waste tray handles and lower the waste tray. 
3. 
Remove the waste container and set 
it 
aside. 
4. 
Select the side of the Quest reactor which you will be using. 
5. 
Align the female hers of the Gas Delivery Manifold with the male luers of 
the reaction vessel outlets. 
6. 
Gently push the Gas Delivery Manifold onto the male luers until it is held in 
place. 
7. 
Raise the waste tray to lock the Gas Delivery Manifold 
in 
place. 
Figure 
4 
below  shows a schematic of the Quest Lower Manifold with the 
Gas Delivery Manifold: 
A 
separated and 
B 
installed. 
GRCM 
- 
User 
Manual 
Artisan Technology Group - Quality Instrumentation ... Guaranteed | (888) 88-SOURCE | www.artisantg.com










