Specifications
USING 
THE 
GRCM 
Hydrogenation 
, 
Operation 
The following list shows the step-by-step  procedure for 
carrying out hydrogenation with the setup shown above. 
1. 
Set up the Quest and GRCM as shown in Figure 
8. 
2. 
Make sure that the apparatus is clean and free of debris. (See the section 
"Cleaning the GRCM"  below.) 
3. 
Control Box inlets: 
a. 
Gas 
1 
- 
Nitrogen 
b.  Gas 
2 
- 
H2 
Gas 
4. 
Add catalyst(s 
) 
to reaction vessels: 
a. 
Pre-weigh Pd/C into 
10 
ml  pFritTM reaction vessels. 
b.  Insert the reaction vessels into the Quest and drop an agitation magnet into 
each one. 
5. 
Purge RVs with nitrogen: 
a. 
Turn the metered gas needle valve clockwise until it 
is 
completely closed. 
b.  Turn Quest control valves to Metered Gas and Utility 
1. 
c. Slowly turn the metered gas needle valve counterclockwise to purge the 
reaction vessels with 
N2. 
6. 
Add solvent under nitrogen via syringe: 
a. 
Remove the Upper Manifold luer plugs from the reaction vessels. 
b. To each reaction vessel, add the reaction solvent followed by the 
hydrogenation substrate in  solution. 
7. 
Replace the luer plugs in the Quest Upper Manifold Luer ports, and tighten. 
8. 
Turn the Quest reactor Control Valve 
2 
from METERED GAS to CLOSED 
(leave Control Valve 
1 
on Utility 
1). 
9. 
Connect the 
H2 
tank to inlet port 
2 
on the GRCM Control Box. 
GRCM 
- 
User 
Manual 
10. 
Turn the gas selection valve on the Control Box to Gas 
1 
(N2). 
Artisan Technology Group - Quality Instrumentation ... Guaranteed | (888) 88-SOURCE | www.artisantg.com










