Specifications
1 
Caution 
1. 
Purge with nitrogen: 
a. Slowly turn the Out 
A 
needle valve counterclockwise approximately 
'/4 
turn to 
deliver nitrogen. 
Excessive opening of the Out 
A 
needle valve at this time may 
cause the liquids 
in the 
RV 
to "bump" (bubble excessively). 
b.  Carefully open the lower manifold drain valves of the Quest reactor to start 
purging the reaction vessels with nitrogen. 
12. 
Hydrogenation: 
a.  Before starting the hydrogenation, make sure that the H2 pressure on the 
external gas regulator is set to a maximum pressure of 
10 
psig (1.69 barr) or 
desired lower value. 
b. Turn the Gas Selection valve of the GRCM Control Box to Gas 
2 
(H2) and 
turn the Out A needle valve counterclockwise to open it. 
c. Switch the Quest Control Valve 
1 
from UTILITY 1 to CLOSED. 
d. Move the membrane switch (above the Quest control valves) from OPEN to 
CLOSED. 
e.  Program the desired mixing rate on the Quest controller and start the 
agitation. 
13. 
Venting the reaction: 
a. Turn the Out A needle valve on the GRCM control box clockwise to close it. 
b.  Move the membrane pressure switch (above the two Quest control valves) 
from CLOSED to 
OPEN. 
c. 
Turn the Quest reactor Control Valve 
1 
from CLOSED to UTILITY 
1. 
14. 
Purge with nitrogen: 
a.  Rotate the Gas selection valve of the GRCM Control Box to GAS 1. 
b.  Turn the Out A needle valve counterclockwise to open it and purge the 
reaction vessels for one (1) minute. 
c. Close the lower manifold drain valves of the Quest reactor. 
d.  Turn the Out A needle valve of the GRCM control box clockwise to CLOSED 
15. 
Remove the Gas Delivery Manifold from the Quest reactor. 
GRCM 
- 
User 
Manual 