Specifications

1
Caution
1.
Purge with nitrogen:
a. Slowly turn the Out
A
needle valve counterclockwise approximately
'/4
turn to
deliver nitrogen.
Excessive opening of the Out
A
needle valve at this time may
cause the liquids
in the
RV
to "bump" (bubble excessively).
b. Carefully open the lower manifold drain valves of the Quest reactor to start
purging the reaction vessels with nitrogen.
12.
Hydrogenation:
a. Before starting the hydrogenation, make sure that the H2 pressure on the
external gas regulator is set to a maximum pressure of
10
psig (1.69 barr) or
desired lower value.
b. Turn the Gas Selection valve of the GRCM Control Box to Gas
2
(H2) and
turn the Out A needle valve counterclockwise to open it.
c. Switch the Quest Control Valve
1
from UTILITY 1 to CLOSED.
d. Move the membrane switch (above the Quest control valves) from OPEN to
CLOSED.
e. Program the desired mixing rate on the Quest controller and start the
agitation.
13.
Venting the reaction:
a. Turn the Out A needle valve on the GRCM control box clockwise to close it.
b. Move the membrane pressure switch (above the two Quest control valves)
from CLOSED to
OPEN.
c.
Turn the Quest reactor Control Valve
1
from CLOSED to UTILITY
1.
14.
Purge with nitrogen:
a. Rotate the Gas selection valve of the GRCM Control Box to GAS 1.
b. Turn the Out A needle valve counterclockwise to open it and purge the
reaction vessels for one (1) minute.
c. Close the lower manifold drain valves of the Quest reactor.
d. Turn the Out A needle valve of the GRCM control box clockwise to CLOSED
15.
Remove the Gas Delivery Manifold from the Quest reactor.
GRCM
-
User
Manual
Artisan Technology Group - Quality Instrumentation ... Guaranteed | (888) 88-SOURCE | www.artisantg.com