Specifications
Using
the Quest
210
1.
Detach the Manifold Delivery Line from the bulkhead fitting on the Quest
reactor unit.
2.
Detach the Gas Delivery Manifold Line from the proper Out A or Out
B
outlet on the GRCM control box, and attach
it
to the Quest 210 at the
bulkhead connector.
3.
Rest the Gas Delivery Manifold over the Quest waste tray.
4.
Start the flow of solvent by turning the Quest 210 Control Valve 1 to
SOLVENT for 10-30 seconds.
5.
Turn Control Valve
1
to DRAIN GAS for 10-30 seconds to clear the solvent.
Alternate between solvent and drain gas for
3
to
6
repetitions.
6.
Complete the cleaning process by turning Control Valve
1
to DRAIN GAS
for
2
to
5
minutes to ensure that all solvent is removed from the Gas
Delivery Manifold.
7.
Turn Control Valve 1 to CLOSED.
8.
Detach Gas Delivery Manifold Line from the Quest 210 and reattach to
outlet on the GRCM control box.
9.
Reattach Upper Manifold Delivery Line to Quest 210.
Using
the Quest
ASW
1.
Detach the Manifold Delivery Line from the bulkhead fitting on the Quest
reactor unit.
2.
Detach the Gas Delivery Manifold Line from the proper Out A or Out
B
outlet on the GRCM control box, and attach it to the Quest 210 at the
bulkhead connector.
3.
Rest the Gas Delivery Manifold over the Quest waste tray.
4.
Select the switch corresponding to the solvent bottle on the ASW tray
containing alcohol.
5.
Start solvent flow by turning the Quest 210 Control Valve 1 to SOLVENT for
10-30 seconds.
6.
Turn Control Valve 1 to DRAIN GAS for 10-30 seconds to clear the solvent.
Alternate between solvent and drain gas for 3 to
6
repetitions.
GRCM
-
User
Manual
Artisan Technology Group - Quality Instrumentation ... Guaranteed | (888) 88-SOURCE | www.artisantg.com










