Operating Instructions

5 Installation and commissioning
Edition EN 2020/07 CARSHARING ZUSATZKARTENLESER Operating Instructions
12/22
5 Installation and commissioning
5.1 Commissioning
Following steps, only be carried out by the service technician.
Push the locking clips inwards and lift the top shell lightly fig. 5.1
Housing is now open fig 5.2
Remove the upper shell
Remove the PCB from the lower shell.
Caution: do not damage the micro switches (PCB top & bottom)
Insert the battery into the battery holder
Insert the PCB into the lower shell
Connect upper with lower shell and close the housing
Glue the supplied adhesive tapes to the defined position on the
lower shell of the ZKL fig 5.3
Fix the ZKL to the defined position in the vehicle
Fig. 5.1 Locking Clips