User's Manual
Table Of Contents
- 1 Introduction
- 2 Description
- 3 Installation of the Base Station
- 3.1 Base Station Cabling
- 3.2 Install the Base Station
- 3.2.1 Fix the Mounting Bracket to a Wall
- 3.2.2 Fix the Mounting Bracket to a Ceiling
- 3.2.3 Fix the Mounting Bracket to a Pole or Beam
- 3.2.4 Use the Cable Ducts for IPBS1
- 3.2.5 Connect External Antennas (only IPBS2 and DB1)
- 3.2.6 Secure the Cable
- 3.2.7 Pinning
- 3.2.8 Connect the Base Station Cables
- 3.2.9 Mount the Base Station
- 3.3 Power the Base Station
- 4 Installation of the IPBL
- 5 Related Documents
- Document History
- Appendix A. RFP Power Consumption
TD 92989EN
15 October 2014 / Ver. B
Installation Guide
IP-DECT Base Station & IP-DECT Gateway
12
2.4 BS3x0
The following versions are available:
• BS330 with Internal antenna
• BS340 with External antennas
Figure 5. BS3x0 Overview
Contents of the Box
The box in which the base station is packed contains:
•A base station
• Two antennas (only base station with external antenna)
• A mounting bracket
• Two screws with wall plugs
Power Distribution
The base station can be powered using the following methods:
• From the IPBL via the Express Powering Pair (EPP) and data pairs
• With a local AC-adapter
NOTE: For more information about power distribution, see 3.3 Power the Base Station on
page 25.
Test
(RJ12)
Data/Power
(RJ45)
Data/Power
(RJ45)
Front view Back view
LED1
LED2
007