User's Manual
Table Of Contents
- 1 Introduction
- 2 Description
- 3 Installation of the Base Station
- 3.1 Base Station Cabling
- 3.2 Install the Base Station
- 3.2.1 Fix the Mounting Bracket to a Wall
- 3.2.2 Fix the Mounting Bracket to a Ceiling
- 3.2.3 Fix the Mounting Bracket to a Pole or Beam
- 3.2.4 Use the Cable Ducts for IPBS1
- 3.2.5 Connect External Antennas (only IPBS2 and DB1)
- 3.2.6 Secure the Cable
- 3.2.7 Pinning
- 3.2.8 Connect the Base Station Cables
- 3.2.9 Mount the Base Station
- 3.3 Power the Base Station
- 4 Installation of the IPBL
- 5 Related Documents
- Document History
- Appendix A. RFP Power Consumption
TD 92989EN
15 October 2014 / Ver. B
Installation Guide
IP-DECT Base Station & IP-DECT Gateway
20
Figure 9. Fixing the mounting bracket to a pole or beam.
3.2.4 Use the Cable Ducts for IPBS1
When the base station IPBS1 is mounted to the wall, cable ducts can be used to route the
wiring through.
1 Fix the cable duct to the wall in one of the positions shown in figure 10 on page 21.
Tied
wrongly
012