User's Manual
Table Of Contents
- 1 Introduction
- 2 Description
- 3 Installation of the Base Station
- 3.1 Base Station Cabling
- 3.2 Install the Base Station
- 3.2.1 Fix the Mounting Bracket to a Wall
- 3.2.2 Fix the Mounting Bracket to a Ceiling
- 3.2.3 Fix the Mounting Bracket to a Pole or Beam
- 3.2.4 Use the Cable Ducts for IPBS1
- 3.2.5 Connect External Antennas (only IPBS2 and DB1)
- 3.2.6 Secure the Cable
- 3.2.7 Pinning
- 3.2.8 Connect the Base Station Cables
- 3.2.9 Mount the Base Station
- 3.3 Power the Base Station
- 4 Installation of the IPBL
- 5 Related Documents
- Document History
- Appendix A. RFP Power Consumption
TD 92989EN
15 October 2014 / Ver. B
Installation Guide
IP-DECT Base Station & IP-DECT Gateway
21
Figure 10. Minimum distances between a cable duct and the mounting bracket
3.2.5 Connect External Antennas (only IPBS2 and DB1)
1 Position the included antenna bracket above the mounting bracket with a
minimum distance of 74 mm (250 mm maximum) and mark the two holes for the
antenna bracket, see
figure 11 on page 22 (1).
2 When using wall plugs: Drill the two holes using a 6 mm drill and insert the
included wall plugs.
3 Position the antenna bracket to the wall and fasten it with the two included 3.5
mm screws.
4 Mount the two included coaxial cables on the antenna bracket, see figure 11 on
page 22 (2). Fasten the coaxial cables with the lock nuts which are found on the
coaxial cable antenna connectors.
5 Mount the antennas on the antenna connectors (2).
TOP
65
mm
125 mm
70 mm75 mm
57 mm
15 mm thick cable ducts
013