User's Manual

TD 93021US Rev A
10 FEB 2014 / Ver A 89
Installation Guide
teleCARE IP
The NIPC2 should be mounted at a minimum height of 90.5in (2300mm) above the floor and at least
8in (200mm) above the highest position of the shower head. Where possible the pull cord should
extend down to approximately 9in (200mm) above the floor.
The following illustration shows some examples of suitable locations for the pull cord module.
Figure 112. Examples of suitable locations for mounting the NIPC2
6.12.2 Positioning the Back box for the Pull Cord Module
The NIPC2 pull cord module must be mounted on a smooth flat surface in order to ensure that it is
splash water proof in accordance with IP44. The ideal surface is a ceramic tiled wall with the back box
for the NIPC2 situated in the center of a tile so that the pull cord module backplate does not sit over a
gap between tiles, as shown in the following illustration:
Max.
300mm
Max.
500mm
Max.
500mm
Min.
2300mm
ca. 200mm
Min. 200mm
Above the highest
position of the
shower head
ca.
200mm
Min.
2300mm
Min. 7.5 ft.
(2300 mm)
Min. 7.5 ft.
(2300 mm)
Min. 9 in. (200 mm)
9 in. (200 mm)
9 in. (200 mm)
Max 12 in.
(300 mm)
Max. 20 in.
(500 mm)
Max. 20 in.
(500 mm)