User's Manual
Table Of Contents
- Contents
- 1 Introduction
- 2 Practical Engineering Parameters
- 3 System LAN Cabling
- 4 System Power
- 5 Control Equipment
- 5.1 Preparation
- 5.2 Room Controller (NIRC3)
- 5.3 Preparing the Room Bus and Power Cables
- 5.4 Voice Piggy Back (NIVP)
- 5.5 Connection Terminals
- 5.6 Connecting the IP Room Controller Printed Circuit Board
- 5.7 LED Lamp Boards (NILD2)
- 5.8 Corridor Lamp (NICL2)
- 5.8.1 Installing the Corridor Lamp
- 5.8.2 Removing the Corridor Lamp Printed Circuit Board
- 5.8.3 Corridor Lamp Housing
- 5.8.4 NICL2 - Corridor Lamp Electrical Connections
- 5.8.5 4-Pole Connector Terminal
- 5.8.6 Connecting the Corridor Lamp Printed Circuit Board
- 5.8.7 LED Lamp Boards for the Corridor Lamp
- 5.8.8 Connecting the LED Lamp Boards
- 5.8.9 External Corridor Lamp Inputs
- 5.9 System Manager (NISM2)
- 6 Peripherals
- 6.1 Preparation
- 6.2 Installation Instructions
- 6.3 Backplates and Surface Mounting Spacer
- 6.4 Switch Module Electrical Connections
- 6.4.1 4-Pole Connector Terminal
- 6.4.2 Preparing the Wires for the 4-pole Connector Terminal
- 6.4.3 Connecting the wire in the 4-pole Connector Terminal
- 6.4.4 4-Pole Connector Terminal with Looped Wiring
- 6.4.5 Disconnecting a Wire from the Connector Terminal
- 6.4.6 Mounting the Switch Module to the Backplate
- 6.4.7 Mounting the Switch Module to the Surface Mounting Spacer
- 6.4.8 Dismantling the Switch Modules
- 6.4.9 Dismantling a Switch Module from a Spacer
- 6.4.10 Dip Switch Settings
- 6.5 Bedside Module (NIBM2)
- 6.6 Medical Rail Socket (NIMS2)
- 6.7 Door Side Module (NIDM)
- 6.8 Pull Cord Module - Active (NIPC-W3A)
- 6.9 Toilet Cancel Module - Active (NITC-XXA)
- 6.10 Pull Cord Module - Passive (NIPC-XXP)
- 6.11 Toilet Cancel Module - Passive (NITC-XXP)
- 6.12 Pull Cord Module (NIPC2) Active and Passive
- 6.12.1 Mounting the NIPC2 Pull Cord Module
- 6.12.2 Positioning the Back box for the Pull Cord Module
- 6.12.3 NIPC2 Back plate
- 6.12.4 Mounting the NIPC2 Backplate
- 6.12.5 Drilling the Backplate Mounting Holes
- 6.12.6 Mounting the Backplate on the Wall
- 6.12.7 Preparing the Cable for the Pull Cord Module
- 6.12.8 Room Bus Electrical Connections
- 6.12.9 Room Bus Address DIP Switch Settings
- 6.12.10 Passive Pull Cord Module Electrical Connections
- 6.12.11 Mounting the NIPC2 Pull Cord Module to the Backplate
- 6.12.12 Assembling and Attaching the Pull Cord
- 6.13 Duty Selector (NIDS)
- 6.14 Card Reader (NICR)
- 6.15 Speech Module (NISP)
- 6.16 Room Display (NIRD)
- 6.17 Television Interface Module
- 6.18 Sunblind Control Module
- 7 External Inputs
- 8 Wireless Functionality
- 8.1 General
- 8.2 Principle of the teleCARE IP with Wireless Functionality
- 8.3 teleCARE Wireless with Speech
- 8.4 teleCARE IP Wireless Planning
- 8.5 Wireless Infrastructure
- 8.6 Principle of the Wireless Infrastructure
- 8.7 teleCARE IP Wireless Components
- 8.7.1 NUREP Wireless Repeater
- 8.7.2 Outdoor Box
- 8.7.3 Wireless Gateway
- 8.7.4 NUWBM3 Wireless Active Bedside Module
- 8.7.5 NIRX teleCARE IP Transceiver
- 8.7.6 Connecting the Transceiver Module
- 8.7.7 NIVP Voice Piggyback Module
- 8.7.8 NIFX Fixed Transceiver
- 8.7.9 NITX Mobile Transceiver
- 8.7.10 NUUTX Universal Transceiver
- 8.7.11 NUWIR Wireless PIR Module
- 8.7.12 IR Range Test
- 8.7.13 NUUTX NUWIR Battery Placement
- 8.7.14 (3) Slide the battery lid back into place until it snap fits.NUUTX NUWIR Mounting Instructions
- 8.7.15 NILF Low Frequency Beacon
- 8.7.6 NILF Electrical Connections
- 8.7.7 NILF DIP Switch Settings
- 8.7.8 NILF Power Supply
- 9 Installation Examples
- 9.1 2-Bed Room with Active Toilet Cancel and Active Pull Cord Peripherals
- 9.2 2-Bed Room with Passive Toilet Cancel and Passive Pull Cord Peripherals
- 9.3 2-Bed Room with a Medical Rail Socket at each Bed
- 9.4 Room Controller with Corridor Lamps (Master/Slave)
- 9.5 4-Bed Room with Speech
- 9.6 Duty Selector at a staff Station
- 9.7 Positioning of the teleCARE IP Peripherals
- Document History
TD 93021US
17 July 2017 / Ver. PF3 14
Installation Guide
teleCARE IP
Caution: Connect the negative (-) lead of the teleCARE IP System to the 4L1 terminal and the
positive (+) lead to the 4L2 terminal.
Re-energize the power supply.
4.2.2 Power Supply (Seismic) Operation and Maintenance
The HPFF8 Power Supply should be tested at least once a year for proper operation. Under normal load
conditions, the DC output voltage should be checked for proper voltage level, which is 24Vdc for the
teleCARE IP system.
Under normal load conditions, check that the battery is fully charged. Check for the specified voltage
(24Vdc) at both the battery terminals and power supply board terminals marked [+BAT-] to ensure there is
no break in the battery connection wires.
Note:
• The maximum charging current under discharge is 0.75 amperes.
• Expected battery life is 5 years. However, it is recommended to change the batteries in 4 years, or
less if needed.
The HPFF8 provides supervised functions of the field wiring for the following adverse conditions:
• Field-wiring fault (short or open) on the teleCARE IP power bus.
• AC failure or brownout at the power supply.
• Battery failure (no battery or battery voltage less than 20.5Vdc) condition at the power supply.
• Battery charger failure on the power supply.
• Ground fault condition.
• +/- Reference Resistor
There are 8 LEDs on the Control Circuit Board for indicating normal and trouble operation of the HPFF8
Power Supply (see Figure 1.1 in the HPFF8 Installation Manual.) When viewed from top to bottom, the
LEDs operate as follows: