Installation Guide
Fig. 34
Step 9: Completing the Installation
A) Remove all labels or shipping materials.
B) Hinge adjustment may be required to complete the installation. (Fig. 34)
a. When adjusting the hinge, use a hand screwdriver.
b. Use the top and bottom hinge to adjust the door panel horizontally.
c. Use the center hinge to adjust the door panel vertically.
C) Insulate between the door frame and the rough opening using minimally expanding window
and door spray foam insulation. Use caution to not overfill the gap causing the jambs to bow.
It is not recommended to apply trim to the unit until the foam has cured to allow the excess to
escape. (Fig. 30, 31, 32 & 33)
D) Operate door unit to ensure proper operation. The panel will not operate correctly if the door
is out of square, over-shimmed or over-insulated.
E) Properly finish all Interior wood components within 60 days of installation.
F) IMPORTANT: Do not stain or paint any hardware or vinyl components.
G) Apply the handle set as appropriate per the manufacturer’s recommendations. Complete final
adjustments as necessary.
H) Swinging doors are to remain closed and locked during construction to prevent site conditions
from damaging and/or warping panels and frames. Allow 10-12 weeks from project
completion for building temperature and humidity levels to stabilize and door panels to
acclimate.
If you should have any questions from installation to adjustments of the Ashworth by Woodgrain
Millwork products please contact Woodgrain directly at 1-800-935-2000.