User Manual

Table Of Contents
Chapter 2: Hardware Setup
2-8
6. Do two (2) clockwise turns on each of the heatsink screws in the cross order pattern
shown on the illustration until the heatsink screws are tightened and the heatsink is
secured onto the motherboard.
Intel
®
recommends a using a torque driver with a T-30 bit and a torque value of 8 lbf-in to
prolong the longetivity of all PEEK nuts after the quality of the load post is corrected.
7. Reinstall the air duct. For more information, see the section
Air Duct
.