User Manual
Table Of Contents
- Safety information
- Chapter 1: Product Introduction
- Chapter 2: Hardware Setup
- 2.1 Chassis cover
- 2.2 Central Processing Unit (CPU)
- 2.3 System memory
- 2.4 Storage devices
- 2.5 Expansion slots
- 2.5.1 The PCI Express riser card
- 2.5.2 Installing an ASUS PIKE II card
- 2.5.3 Reconnecting the cable to the M.2 expansion board (only for SKU-3)
- 2.5.4 Installing an M.2 (NGFF) card
- 2.5.5 Reconnecting the cable to the OCP 3.0 slot baseboard (only for SKU-2)
- 2.5.6 (optional) Installing the PFR module
- 2.5.7 Configuring an expansion card
- 2.6 Cable connections
- 2.7 SATA/SAS backplane cabling
- 2.8 Removable/optional components
- Chapter 3: Installation Options
- Chapter 4: Motherboard Infomation
- Chapter 5: BIOS Setup
- 5.1 Managing and updating your BIOS
- 5.2 BIOS setup program
- 5.3 Main menu
- 5.4 Advanced menu
- 5.4.1 OffBoard SATA Controller Configuration
- 5.4.2 Trusted Computing
- 5.4.3 ACPI Settings
- 5.4.4 Redfish Host Interface Settings
- 5.4.5 Onboard LAN Configuration
- 5.4.6 Serial Port Console Redirection
- 5.4.7 SIO Common Setting
- 5.4.8 SIO Configuration
- 5.4.9 PCI Subsystem Settings
- 5.4.10 USB Configuration
- 5.4.11 Network Stack Configuration
- 5.4.12 CSM (Compatibility Support Module)
- 5.4.13 NVMe Configuration
- 5.4.14 APM Configuration
- 5.4.15 Third-party UEFI driver configurations
- 5.5 Platform Configuration menu
- 5.6 Socket Configuration menu
- 5.7 Event Logs menu
- 5.8 Server Mgmt menu
- 5.9 Security menu
- 5.10 Boot menu
- 5.11 Tool menu
- 5.12 Save & Exit menu
- Chapter 6: Driver Installation
- Appendix
Chapter 2: Hardware Setup
2-20
6. Insert the ASUS PIKE II card into the internal SAS/HBA/Storage bracket, then secure it
with a screw.
7. Align the Cache Vault Power Module clip holder to the screw holes in the chassis, then
replace the Cache Vault Power Module clip holder into the chassis.
8. Secure the Cache Vault Power Module clip holder using the four (4) thumbscrews
removed previously.
1
2
1
2