User Manual
Table Of Contents
- Safety information
- Chapter 1: Product Introduction
- Chapter 2: Hardware Information
- 2.1 Chassis cover
- 2.2 Air ducts
- 2.3 Central Processing Unit (CPU)
- 2.4 System memory
- 2.5 Storage devices
- 2.6 Expansion slot
- 2.6.1 Installing an expansion card to the left PCIe riser card bracket
- 2.6.2 Installing an expansion card to the right PCIe riser card bracket
- 2.6.3 Installing a ASUS PIKE II card to the right PCIe riser card bracket
- 2.6.4 Installing an OCP 3.0 card to the OCP 3.0 slot
- 2.6.5 Installing an M.2 (NGFF) card
- 2.6.6 (optional) Installing the PFR module
- 2.6.7 Configuring an expansion card
- 2.7 Cable connections
- 2.8 Backplane cabling
- 2.9 Storage device configuration and cabling
- 2.10 Removable/optional components
- Chapter 3: Installation Options
- Chapter 4: Motherboard Information
- Chapter 5: BIOS Setup
- 5.1 Managing and updating your BIOS
- 5.2 BIOS setup program
- 5.3 Main menu
- 5.4 Performance Tuning menu
- 5.5 Advanced menu
- 5.5.1 Trusted Computing
- 5.5.2 PSP Firmware Versions
- 5.5.3 Redfish Host Interface Settings
- 5.5.4 APM Configuration
- 5.5.5 Onboard LAN Configuration
- 5.5.6 Serial Port Console Redirection
- 5.5.7 CPU Configuration
- 5.5.8 PCI Subsystem Settings
- 5.5.9 USB Configuration
- 5.5.10 Network Stack Configuration
- 5.5.11 CSM Configuration
- 5.5.12 NVMe Configuration
- 5.5.13 SATA Configuration
- 5.5.14 AMD Mem Configuration Status
- 5.6 Chipset menu
- 5.7 Security menu
- 5.8 Boot menu
- 5.9 Tool menu
- 5.10 Save & Exit menu
- 5.11 AMD CBS menu
- 5.12 Event Logs menu
- 5.13 Server Mgmt menu
- Chapter 6: Driver Installation
- Appendix
3-9
ASUS RS520A-E11-RS12U
1
2
10. Align the server system and gently
insert it into the rack rails.
11. (optional) Use the M5X20L screws to
secure the rack rails to the rack post.
Front end of rack rail
Front rack post
Intermediate railInner rail
12. Gently push the server system until it is completely installed into the rack rail.
(optional) For 1200 mm rack rails, if the inner rail clicks to a stop while you are
installing the server system into the rack rails, slide the blue release tab outwards and
gently push the server system until it is completely installed into the rack rail.
Blue release tab White release tab
The blue release tab is available on 1200 mm rack rails. This blue release tab is used to
further extend or retract the inner rail.