User guide

SECS/GEM Interface 5-3
4. Click on the Communication Tab and refer to Figure 5 -4.
> This tab is used to establish addresses for the host and the device.
> Changes in this dialog box require exiting and restarting FMW in order for the
changes to take effect.
Figure 5 -4
5. Click on Cancel to return to the Main Window.
6. In the FMW Main Window, click on Run a Program.
7. In the Production Window, click on Run.
8. Click on Run Production to go the Run Window.
9. Click on the SECS/GEM Tab and refer to Figure 5 -5.
> This is the message area that the Operator has access to during a production
run. Messages are acknowledged and received.