Instruction manual
MERLIN LEGEND Communications System Release 5.0
Installation
555-650-140
Issue 1
June 1997
Installing the Control Unit
Page 2-19
Installing the Basic Carrier
To install the basic carrier, follow the steps below:
Mark the screw-hole locations on the backboard, using the basic
carrier or the template supplied with the plastic preassembled
backboard as a guide. See Figure 2-5
.
Make sure the carrier is level before marking the holes.
Drill a pilot hole in the center of each of the four screw-hole marks.
Anchor the screws approximately halfway into the backboard.
Position the carrier on the screws and slide the carrier to the left.
Tighten the screws.
Figure 2-5. Marking the Basic Carrier Screw Holes
Backboard
Basic
Carrier
Mounting
Screw
Mounting Surface










