Product information guide

T217
7
Product Information Guide
INSTALLATION
The following procedures are required to install a SPIRIT CS, and the customer pays for
them in the installation charge:
1.
2.
3.
4.
5.
6.
7.
Install the control unit
- Special consideration should be given to:
Local telco CO line terminations (within 25 feet)
Nearest AC outlet for the control unit (within 6 feet)
Access for administration, future growth, and changes
Allowing for proper ventilation (21 inches clearance)
Install station wiring, connect and label sets
- Wiring plan same as MERLIN
®
CS.
Administer system-level features
- Use the system planner and ensure that a copy
is retained with the control unit for programming. The system must be
reprogrammed if the control unit is replaced.
Connect the system to the network interface
- Wire to the RJ connecting blocks at
the demarcation point.
Install auxiliary equipment
- Includes remote bell, music source, or paging system.
Test the system
- Verify controller and set operation.
Customer education - The systems technician’s responsibility; you will become
familiar with the customer training outline in the User Training Manual. lt will guide
your presentation.
At this point, take time to read the Customer Installation Instructions Manual in its entirety.
AT&T – PROPRIETARY