Boiler G.C No E22S E32S 41-310-12 41-310-13 E22C E32C 47-310-13 47-310-14 CE PIN 0063BR3405 8G.52.6000/03.
Content Introduction ...................................................... 3 Safety ............................................................... 4 Description of the boiler .................................... 5 Explanation of the function keys and display .... 7 The Reset key .................................................. 7 The boiler display .............................................. 8 Water pressure in the central heating system ... 9 Replenishing the central heating ......................
Introduction Operating instructions ATAG E-Series These operating instructions describe the functioning and the operating of the ATAG E boilers. This manual is for the end user. For installation and servicing there is an installation & servicing instructions manual for the installer. Read this manual fully before operating the boiler. In case of doubt or errors contact your installer. ATAG Heating reserves the right to change the specifications and dimensions without prior notice.
Safety In case you smell gas: - No naked flames! Do not smoke! Do not operate electrical switches for lights or any other appliance. Do not use a telephone Turn off gas supply at meter Open windows and doors Notify any persons in the building and leave the building at once. Call Gas company or installer only when outside the building Protection from corrosion Do not use any sprays, chlorine containing agents, solvents, paint etc. around the boiler or around the air intake supply entrance of the boiler.
Description of the boiler The ATAG E boiler is a room sealed, condensing and modulating central heating boiler, with or without an integrated hot water facility. Condensing Retrieves heat from the flue gasses. Water condensates on the heat exchanger. Modulating Higher or lower burning according to the heat demand. Stainless Steel Super solid kind of steel which keeps its quality for life. It will not rust or erode in contrast to composition materials, like aluminium.
Example SEDBUK ClassA The efficiency of the boiler is very high and the radiation convection and standby losses very low. The emission of noxious substances is far below the fixed standards so the boiler is SEDBUK Class A rated. When the boiler is connected to an ATAG BrainQ or Smart a lot of information can be retrieved from the boiler. For more information about the ATAG thermostats. Please refer to the user manuals.
Explanation of the function keys and display Display Indication L.E.D.'s Central heating on/off Domestic Hot water on/off Step key Scrolling + Mode key Selecting chapters Reset key Pump program on/off Unlocking the boiler On/off key Central heating. When 'on' the indication L.E.D. is illuminated. On/off key Domestic hot water (DHW) When 'on' the indication L.E.D. is illuminated. On/of key Pump programm. Continuously yes/no When 'on' the indication L.E.D. is illuminated.
The boiler display The boiler display can be set to read in two ways: The Good reading During this reading the display will only show what is necessary. Under normal circumstances the display will give a Good reading. If a fault is detected the boiler will be blocked. This will be shown with, alternate display of Good, with an E of Error or a BL of Blocking and a number code. For further information refer to page 13 "Errors, maintenance and warranty" .
Water pressure in the central heating system The installation will function optimally with a water pressure of between 1,5 and 1,7 bar. If the water pressure drops below 1 bar, the display will show FILL. During this message the boiler will remain functioning at a reduced level. After replenishing the system to just above 1,5 bar the message FILL will disappear and the boiler will function normally again. When the water pressure drops below 0,7 bar, the display will show a flashing FILL text.
Replenishing the central heating system The central heating installation needs to be filled with potable (drinking) water. For topping up the installation you use the filling loop according to the following procedure: (If in any doubt please contact your dealer) 1 Switch all functions off (heating, DHW and pump); 2 Briefly push the 'STEP'-button: P x.x = water pressure in bar; 3 Slowly open the filling loop (Indication on display increases); 4 Fill up slowly to 1.5 to 1.
The boiler will not function directly. The automatic de-aeration programme of about 17 minutes will start after one of the three program keys is pressed. The display will show where A stand s for Automatic de-aeration programme Active and the number on the right indicates the actual water temperature of the boiler. Check the water pressure regularly and top up the installation when necessary. The working pressure of the installation should be between 1.5 and 1.
Turning the boiler off Operating instructions ATAG E-Series Holiday The ATAG BrainQ room thermostat is provided with a holiday program. The holiday period can be adjusted on the thermostat itself. The central heating and DHW supply are switched off during that period. There is also the option that only the central heating is switched off. With all of these possibilities the frost protection system is active. 12 Holiday period: Adjust the thermostat to the holiday period. See the user thermostat manual.
Error, maintenance and warranty If a fault is detected the boiler will be blocked. This will be reflected, by an alternate display of Good, with an E for Error or a BL for Blocking and a number code. You can try to reset the boiler by pressing the Reset key once. If the problem remains please contact your installer and inform them about the fault and give them the number code. If you discover any leaks from the boiler contact your installer.
Adjustments The boiler has a large number of settings options. We advise you to contact your installer for adjusting the boiler to your required settings. Adjusting the flow water temperature (CH) - - Press the Mode key briefly (from the Technical reading). The display will show PARA . Press the Step key once. The display will show 1 85 . Press the + or the - key to alter the adjustments, if necessary. Press the Store key to confirm the setting. The display will flash once. Press the Mode key briefly.
Adjusting the type of installation + Step - Mode Store Reset The boiler is designed in such a way that it will adjust itself automatically to what is necessary for a normal heating system. In some cases the installation may have convectors or complete underfloor heating. One can easily choose heating installation adjustments appropriate for the system such as maximum water-flow temperature or for the warming up of the installation after a night period.
Details of your installer: Name of installer: Address: Contact: Phone number: Phone number outside business hours: Ditributor for UK ATAG Heating UK Ltd. • Unit 3 • Beaver Trade Park • Quarry Lane Chichester West Sussex PO19 8NY • Phone: 01243 815 770 • Fax 01243 839 596 E-mail: info@atagheating.co.uk • Internet: www.atagheating.co.uk Ditributor for Ireland Total Energy Management Ltd.