Operation Manual
Manuals
Brands
ATAG Manuals
Household
ES1211AAM
95
96
97
98
99
100
101
102
103
104
GB 26
I
N
S
T
A
L
L
A
T
I
O
N
-
Connect
the
flexible
pipe
H
(not
provided)
to
the air evacuation hole
A
(Fig.15).
-
Connect to the electrical mains (Fig.16).
-
Connect
the
top
chimney
B
to
the
structur
e
using the two screws
F
(Fig.17).
Fig.15
Fig.16
Fig.17
1
...
...
100
101
102
103
104