Operation Manual

101
3-phase connection (3 a.c. 230 V / 50 Hz):
The voltage between the phases and the neutral is 230 V a.c.
Install connecting bridges between the connection points 4-5. Uw groepen
moeten afgezekerd zijn met minimaal 16 A (3x). The connecting power
cable must have a minimum core cross section of 2,5 mm
2
.
You can use the bridges provided on the connecting block to make the
required interconnections as indicated in the preceding illustrations. How to
install the bridges is indicated in the junction box cover and in the
illustration below. The bridges should not be placed immediately on top of
the connecting wires, but between the screw-head and the clamp around the
connecting wire.
Secure the cable with the strain relief and close the cover.
built in HL60..EINSTALLATION GUIDE
2 lives with 1 neutral connection (2 1N a.c. 400 V / 50 Hz):
The voltage between the phases and the neutral is 230 V a.c. Between the
lives there is a voltage of 400 V. If there is not a voltage of 400 V between
the lives, two wires have been taken from the same live in the meter
cupboard and the hob must be connected with two neutral wires, as
indicated above under 2 lives with 2 neutrals.
Install a connecting bridge between the connection points 4-5.
Your groups must be fused with at least 16 A (2x). The connecting power
cable must have a minimum core cross section of 2,5 mm
2
.
3 lives with 1 neutral connection (3 1N a.c. 400 V / 50 Hz):
The voltage between the phases and the neutral is 230 V a.c. There is a
voltage of 400 V between the lives. Fit a connecting bridge between the
connection points 4-5. Phase 3 carries no load. Your groups must be fused
with at least 16 A (3x). The connecting power cable must have a
minimum core cross section of 2,5 mm
2
.
100
built in HL60..EINSTALLATION GUIDE