Operation Manual
EN 13
Wall drilling and bracket fixing
min.550
min.650
Wall marking:
• Draw a vertical line on the supporting wall up to the ceiling, or as
high as practical, at the centre of the area in which the hood will be
installed.
• Draw a horizontal reference line at 650 mm above the hob.
• Place bracket 7.2.1 on the wall as shown about 1-2 mm from the
ceiling or upper limit aligning the centre (notch) with the vertical
reference line.
• Mark the centres of the holes on wall.
• Place bracket 7.2.1 on the wall as shown at X mm below the first
bracket (X = height of the upper chimney section supplied), aligning
the centre (notch) with the vertical line.
• Mark the centres of the holes on wall.
• Mark a reference point as indicated at 116 mm from the vertical line
and 305 mm above the horizontal reference line.
• Repeat this operation on the other side.
• Drill ø 8 mm holes at all the centre points marked.
• Insert the wall plugs 11 in the holes.
• Install the lower bracket 7.2.1 using the 12a screws (4,2 x 44,4).
• Install the upper bracket 7.2.1 and the air outlet connection support
7.3 together using the 2 screws 12a (4,2 x 44,4).
• Insert the two screws 12a (4,2 x 44,4) in the hood body fixing holes,
leaving a gap of 5-6 mm between the wall and the head of the
screw.
INSTALLATION