Operation Manual

EN 13
Wall drilling and bracket fixing
min.550
min.650
Wall marking:
Draw a vertical line on the supporting wall up to the ceiling, or as
high as practical, at the centre of the area in which the hood will be
installed.
Draw a horizontal reference line at 650 mm above the hob.
Place bracket 7.2.1 on the wall as shown about 1-2 mm from the
ceiling or upper limit aligning the centre (notch) with the vertical
reference line.
Mark the centres of the holes on wall.
Place bracket 7.2.1 on the wall as shown at X mm below the first
bracket (X = height of the upper chimney section supplied), aligning
the centre (notch) with the vertical line.
Mark the centres of the holes on wall.
Mark a reference point as indicated at 116 mm from the vertical line
and 305 mm above the horizontal reference line.
Repeat this operation on the other side.
Drill ø 8 mm holes at all the centre points marked.
Insert the wall plugs 11 in the holes.
Install the lower bracket 7.2.1 using the 12a screws (4,2 x 44,4).
Install the upper bracket 7.2.1 and the air outlet connection support
7.3 together using the 2 screws 12a (4,2 x 44,4).
Insert the two screws 12a (4,2 x 44,4) in the hood body fixing holes,
leaving a gap of 5-6 mm between the wall and the head of the
screw.
INSTALLATION