User manual

Park Management Control Panel
Found on control panels for administration:
1. Pin – Minimizes the current window or
toolbox and pins it to the edge of
the screen
2. Scroll – Scrolls the list up and down.
27
Track Ride Construction Panel
Found on control panels for track rides:
1. Construction Options – Expands the
track options portion of the object
control window, allowing you to build
or change track pieces for the ride.
2. Track Pieces – Shows the tracks you
can place next.
3. Lift Adds or removes the chain drive
for the highlighted track piece.
4. Loading Station Toggles whether or
not a boarding station is added to the
highlighted track piece.
5. Block Brake Toggles whether or not
a block brake is added to the highlighted
track piece. (For track rides with more
than one train.)
6. Straight Brake Toggles whether or not
straight brakes are added to the highlighted
track piece. (To reduce the speed of trains
on a track ride.)
26
7. Photo Trigger Toggles whether or
not a photo trigger is added to the high-
lighted track piece.
8. Bank Adjusts the banking options for
the highlighted track piece.
9. Remove – Removes the selected
(or previous) track piece.
10. Autocomplete – Automatically places
the remaining tracks for the coaster
being edited. After an autocomplete solu-
tion is found, click the icon again to
accept the autocomplete solution, or
click on another track piece to cancel.
11. Height markers – Click to turn the
height markers on or off for this ride.
12. Special Tracks – Shows what special
tracks may be added next. This selection
changes depending on what piece has
last been placed.
3. Sort – Sorts the list by the selected
criteria.
4. Dropdown – Causes a list to be
displayed.
1
43
2
1
2 3
8
4
7
5
6
10
11
9
12
RCT 3 PC_ManInt_REV 12/3/04 11:12 AM Page 26