User manual
Table Of Contents
- KN1108v / KN1116v User Manual
- Introduction
- Hardware Setup
- Super Administrator Setup
- Logging In
- The User Interface
- The Web Browser Main Page
- Laptop USB Console Main Page
- The AP GUI Main Page
- The Local Console GUI Main Page
- The Control Panel
- Port Access
- User Management
- Device Management
- Log
- Maintenance
- Download
- Port Operation
- The Log Server
- Appendix
- Safety Instructions
- Consignes de sécurité
- Technical Support
- Specifications (English)
- Technische Daten (Deutsch)
- Troubleshooting
- IP Address Determination
- IPv6
- Port Forwarding
- Keyboard Emulation
- PPP Modem Operation
- Internal Serial Interface Configuration
- Additional Mouse Synchronization Procedures
- Additional Video Resolution Procedures
- Trusted Certificates
- Self-Signed Private Certificates
- Clear Login Information
- Factory Default Settings
- Serial Adapter Pin Assignments
- Supported KVM Switches
- Supported Power Over the Net™ Units
- Virtual Media Support
- Limited Warranty
KVM Over the NET™ User Manual
126
3. Configure the outlet according to the information provided in the
following table:
Note: If there is a conflict between the day set in the Period panel and
the time the operation is supposed to start, a message will appear
informing you of the problem. Click the Date/Time button and
reset the time and date.
4. When you have finished making your configuration settings, click
Save.
5. Repeat the above steps to set up additional schedules.
To modify a schedule, select it in the main panel, then click Modify.
The Outlet Schedule dialog box comes up – make your changes, then
click Save.
To delete a schedule, select it in the main panel, then click Remove.
To run all power operations listed in the Outlet Schedule dialog box
now – without waiting for the scheduled time to arrive – click Run.
To stop all power operations listed in the Outlet Schedule dialog box,
click Stop.
Synchronization
If more than one outlet has been selected for association with a port,
Synchronization can be used to standardize their configurations.
Enabling Synchronization (by checking the checkbox), brings up the
Pon Outlet Configuration dialog box (see Configuration, page 123).
The settings that you make are applied to all the outlets associated with
the port so that their settings are all the same, and all the outlets
associated with the port have the same schedule configuration as the
first PON outlet.
Field Explanation
Schedule Name Provide a name to identify the scheduled operation by.
Operation
Mode
Select the type of power operation you want to occur at the
scheduled time.
Period Select the time period that the scheduled operation will occur
at: Once; Weekdays; or Daily – then drop down the list to
select which day the operation is to start on.
Time Click the Date/Time button to select the time and date the
operation is to start on.