English Installation installation Manuel Atezr P5/P10/P20 Plus
Contacter Atezr 01 Package Contents 02 Cautions 03 Assembly Guide 04 Product Regulation 14 ŮÖDž ƒŅųŢ RŅųŢĽýƒ 15 After-sales and Warranty Policy 16 Dear user: Welcome to join! Thank you for purchasing the P5/P10/P20 Plus with Atezr.
CONTACTING ATEZR 滶滼滹滹滵 ÖğĵŢŅÖù Ů 澴 ğŮƒ ŅĒ DĽùųŦŮLj澴 澴滾滶滼滹滽 Ŧýdžğóý煿ÖŮýƚŢ澳óŅĻ www.atezr.
Packaging List Power cable Upper and ĵŅƌýŢ ŦųşşŅDž òýÖĻ Optical axis Power Adapter Display screen HDMI cable Laser Module X-axis slide rail Y-axis left and right slide rails Safety goggles Dust-free cloth Metal mat board óLjĵğó ŦěýýŮ澿滸~ USB cable ;ŅŅŮ òŢÖóıýŮ澿滹 ªŅŅù óěğşŦ澿滸~ Mounting screws Product Manual USB card and card reader Brush Wire tie Toolkit °Ņų óÖĽ ŦóÖĽ Ůěý óŅùý ŮŅ ǁĽù Ůěý ğĽŦŮÖĵĵÖŮğŅĽ ŮųŮŅŢğÖĵ澳 Synchronous belt - 02 -
ÖųŮğŅĽŦ 濧濧濧 01 High-intensity laser beams generate extremely high temperatures and a lot of heat ÖŦ óųŮŮğĽē òųŢĽŦ Ůěý ŦųòŦŮŢÖŮý šųÖĽŮğŮƒ澳 ýDžÖğĽ ĻÖŮýŢğÖĵŦ ĻÖƒ óÖŮóě ǁŢý ùųŢğĽē óųŮŮğĽē澴 creating gas and smoke.
C F B2 A 1 E3 E4 D B1 E1 A2 E2 A1 A2 B1 Y-axis left and right slide rails C D X-axis slide rail Optical axis B2 şşýŢ ÖĽù ĵŅƌýŢ ŦųşşŅDž òýÖĻ E1 E2 E3 E4 ųşşŅDž ĒýýŮ °Ņų óÖĽ ŦóÖĽ Ůěý óŅùý ŮŅ ǁĽù Ůěý ğĽŦŮÖĵĵÖŮğŅĽ ŮųŮŅŢğÖĵ澳 F Laser module - 04 -
Step 1 Framework assembly A2 B2 B1 A1 瀨\滹澿滶滷瀩16PCS 0.01inch(2.
Step 2 Install the belt tension adjustment nut 瀨\滺澿滷滺瀩2PCS 0.
Step 3 Install the X-axis assembly It is recommended to push the Y-axis slide to the top to keep it horizontal then install the X-axis assembly 瀨\滺澿滻滵瀩4PCS 0.
Ůýş 滹 DĽŦŮÖĵĵ Ůěý òŅŮŮŅĻ ŦųşşŅDž ĒýýŮ Pay attention to the distinction between Ůěý ĵýĒŮ ÖĽù ŢğēěŮ ŅĒ Ůěý ŦųşşŅDž ĒýýŮ 瀨\滺澿滻瀩12PCS 0.
Step 5 Install the polished rod VŅóı Ůěý şŅĵğŦěýù ŢŅù °Ņų óÖĽ ŦóÖĽ Ůěý óŅùý ŮŅ ǁĽù Ůěý ğĽŦŮÖĵĵÖŮğŅĽ ŮųŮŅŢğÖĵ澳 - 09 -
Step 6 Mounting the Laser ğēěŮýĽ Ůěý ĵÖŦýŢ ĻŅùųĵý ÖùĭųŦŮĻýĽŮ ıĽŅò 瀀ýÖŢ ŅĒ Ůěý ĵÖŦýŢ ĻŅùųĵý瀁 °Ņų óÖĽ ŦóÖĽ Ůěý óŅùý ŮŅ ǁĽù Ůěý ğĽŦŮÖĵĵÖŮğŅĽ ŮųŮŅŢğÖĵ澳 - 10 -
Step 7 Install the cable tie X6 Attach the cable ties on the X-axis and Y-axis °Ņų óÖĽ ŦóÖĽ Ůěý óŅùý ŮŅ ǁĽù Ůěý ğĽŦŮÖĵĵÖŮğŅĽ ŮųŮŅŢğÖĵ澳 - 11 -
Step 8 Install the cable tie 滻 ěŅĵýŦ ÖŢý óŅĽĽýóŮýù ŮŅ Ůěý ĻŅŮŅŢ 滹 ěŅĵýŦ ÖŢý óŅĽĽýóŮýù ŮŅ Ůěý ĵÖŦýŢ ĻŅùųĵý 滷 ěŅĵýŦ ÖŢý óŅĽĽýóŮýù ŮŅ Ůěý ĵğĻğŮ ŦƌğŮóě ~Öƒ ÖŮŮýĽŮğŅĽ ŮŅ Ůěý ĒŢŅĽŮ ÖĽù òÖóı ŅĒ Ůěý ğĽŮýDŽÖóý澳 ý ÖƌÖŢý ŮŅ ğĽŦýDž óŅŢŢýóŮĵƒ澳 01 02 01 03 02 03 °Ņų óÖĽ ŦóÖĽ Ůěý óŅùý ŮŅ ǁĽù Ůěý ğĽŦŮÖĵĵÖŮğŅĽ ŮųŮŅŢğÖĵ澳 - 12 -
Mission Completed Congratulations! °Ņų óÖĽ ŦóÖĽ Ůěý óŅùý ŮŅ ǁĽù Ůěý ğĽŦŮÖĵĵÖŮğŅĽ ŮųŮŅŢğÖĵ澳 - 13 -
Emergency Button dĽ濗dƺ Reset ~ŅƌýŢ DĽŮýDŽÖóý Data Cable DĽŮýDŽÖóý Tf Card Slot Adjust The Belt Tension 01 Y axis: 滶澳 VŅŅŦýĽ Ůěý ǁƑğĽē ĽųŮ ŅĽ Ůěý Ŧğùý 2. Adjust the back tightening nut, and adjust the belt to the proper tightness 滸澳 ğēěŮýĽ Ůěý Ŧğùý瀲ǁƑğĽē ĽųŮ ğēěŮ 02 Loose ğēěŮ Loose 01 X-axis: 滶澳 VŅŅŦýĽ Ůěý ǁƑğĽē ĽųŮ ŅĽ Ůěý Ŧğùý 2.
FCC Warning This device complies with part 15 of the FCC Rules. Operation is subject to the following two conditions: (1) This device may not cause harmful interference, and (2) this device must accept any interference received, including interference that may cause undesired operation. Any Changes or modifications not expressly approved by the party responsible for compliance could void the user's authority to operate the equipment.