Product Manual
Table Of Contents
- Table of contents
- 1 Safety precautions
- 2 General description
- 3 Controller
- 3.1 General
- 3.2 Control panel
- 3.3 Icons used
- 3.4 Main screen
- 3.5 Calling up menus
- 3.6 Shutdown warning
- 3.7 Shutdown
- 3.8 Inputs menu
- 3.9 Outputs menu
- 3.10 Counters
- 3.11 Control mode selection
- 3.12 Service menu
- 3.13 Setpoint menu
- 3.14 Event history menu
- 3.15 General settings menu
- 3.16 Info menu
- 3.17 Week timer menu
- 3.18 Test menu
- 3.19 User password menu
- 3.20 Web server
- 3.21 Programmable settings
- 4 Installation guidelines
- 5 Operating instructions
- 6 Maintenance
- 7 Adjustments and servicing procedures
- 8 Problem solving
- 9 Technical data
- 10 Guidelines for inspection
- 11 PED (Pressure Equipment Directive)
- 12 Declaration of conformity
Text on image
(1) Monday (5) Yes
(3) Are you sure? (6) Save
(4) No (7) Modify
Press the Escape key to leave this window.
•
The action is shown below the day the action is planned.
Text on image
(1) Week Action Scheme 1 (5) Thursday
(2) Monday - Start (6) Friday
(3) Tuesday (7) Saturday
(4) Wednesday (8) Sunday
Press the Escape key on the controller to leave this screen.
Programming the week cycle
A week cycle is a sequence of 10 weeks. For each week in the cycle, one of the four
programmed week schemes can be chosen.
•
Select Week Cycle from the main Week Timer menu list.
Text on image
(1) Week Timer (4) Status
(2) Week Action Schemes (5) Week Timer Inactive
(3) Week Cycle (6) Remaining Running Time
• A list of 10 weeks is shown.
Instruction book
2920 7140 52 59