Product Manual

Table Of Contents
5 Operating instructions
5.1
Initial start-up
Safety
The operator must apply all relevant Safety precautions.
Initial start-up procedure
1.
Remove the red painted transport brackets (2).
2. Check the settings of the overload relays. See section Electric cable size and fuses.
3.
Connect the compressor electrically. See section Electrical connections.
4. Close the condensate drain valve. See chapter Condensate management in section Flow
diagram.
5. Switch on the voltage. Start and stop the compressor. On 3-phase compressors, check for
correct direction of rotation (direction arrows are provided on the motors). If the rotation
direction is wrong, switch off the voltage and reverse two incoming electric lines.
5.2 Starting
Procedure
1. Open the air outlet valve. See section Introduction for its location.
Instruction book
2920 7140 52 81