Product Manual
Table Of Contents
- Table of contents
- 1 Safety precautions
- 2 General description
- 3 Elektronikon controller
- 3.1 General description
- 3.2 Control panel
- 3.3 Icons used on the display
- 3.4 Main screen
- 3.5 Shut-down warning
- 3.6 Shut-down
- 3.7 Service warning
- 3.8 Scrolling through all screens
- 3.9 Calling up element and dew point temperatures
- 3.10 Digital inputs
- 3.11 Calling up running hours
- 3.12 Calling up motor starts
- 3.13 Calling up module hours
- 3.14 Calling up/resetting the service timer
- 3.15 Selection between Local, Remote or LAN control
- 3.16 Calling up/modifying CAN address control
- 3.17 Calling up/modifying IP, Gateway and Subnetmask
- 3.18 Calling up/modifying pressure band settings
- 3.19 Modifying pressure band selection
- 3.20 Calling up/modifying service timer settings
- 3.21 Calling up/modifying unit of temperature
- 3.22 Calling up/modifying unit of pressure
- 3.23 Automatic restart after voltage failure
- 3.24 Activating password protection
- 3.25 Calling up/modifying protection settings
- 3.26 Test screens
- 3.27 Web server
- 3.28 Programmable settings
- 4 Elektronikon Graphic Controller
- 4.1 General
- 4.2 Control panel
- 4.3 Icons used
- 4.4 Main screen
- 4.5 Calling up menus
- 4.6 Shutdown warning
- 4.7 Shutdown
- 4.8 Inputs menu
- 4.9 Outputs menu
- 4.10 Counters
- 4.11 Control mode selection
- 4.12 Service menu
- 4.13 Setpoint menu
- 4.14 Event history menu
- 4.15 General settings menu
- 4.16 Info menu
- 4.17 Week timer menu
- 4.18 Test menu
- 4.19 User password menu
- 4.20 Web server
- 4.21 Programmable settings
- 5 Installation
- 6 Operation
- 7 Preventive maintenance
- 8 Adjustments and servicing procedures
- 9 Problem solving
- 10 Technical data
- 11 Instructions for use
- 12 Guidelines for inspection
- 13 Pressure equipment directives
- 14 Declaration of conformity
6 Operation
6.1
Initial start-up
Safety
The operator must apply all relevant Safety precautions during operation.
The maximum recommended motor starting frequency is starts is 20 starts per hour. In
order to keep the number of starts at an acceptable level, the compressor must be
connected to an air receiver with a suitable size.
Initial start-up
1.
Remove the yellow painted transport brackets (E, F) (if applicable)
Transport brackets on SF 6 and SF 6
+
2. Close the air outlet valve (AV - see section Introduction ).
3.
Check the settings of overload relay (F21 - see section Settings of overload relay and fuses).
Check the drive motor connections. Connect the compressor to the electricity net.
4. Close the condensate drain valve(s). See sections Introduction and Flow diagram for their location.
5. Switch on the voltage. Press the start button on the Elektronikon® controller and immediately press
the stop button.
On 3-phase units, check the rotation direction of drive motor. For this purpose, a sheet with start-up
instructions is fitted to the outlet grating. When the rotation direction is correct, the paper will be
Instruction book
118 2920 7110 21