Specifications

FCS1362 Page 62 of 74 © Nov 2010
Mobile Installation Check List – Page 2 of 2
Record and report any effects noticed during the following post-installation tests:
EMC Test 1. (Radiated Immunity) With the engine at 1500 RPM, transmit on low, middle and high frequencies of the used band,
operate and observe both the operational equipment (E.G. The light bar and headlight flashers if fitted) and the unshaded items
in column “E1” of table 1. Pay particular attention to the engine speed, the rev. counter and the ABS warning indicator.
EMC Test 2. (Radiated Emissions) Note any significant radio interference caused by either operational equipment or
“continuous use” vehicle systems (e.g. engine, heater motor or wipers). Record results in the unshaded boxes of column E2 of
table 1.
The installer cannot be held responsible for changes to the installation after hand-over to the user. This vehicle has been
installed and checked under the guidance of FCS1362:2010.
Owner’s Name (Print): ………………………………….…. Signature: ….…………………….………...... Date: ……………..
Engineer’s Name (Print): ………………….………….……... Signature: …………………………….…...… Date: …………….