W 38 in H in 54 22 in D INSTALLATION AND CARE GUIDE
BEFORE YOU BEGIN ! Please read and understand this manual prior to installation ! Professional installation recommended ! Protect all surfaces from sharp objects, high heat sources, and chemical hazards ! Please unwrap and carefully check all parts against PART LIST and report any missing items to your retailer Two-man crew handling needed Do not lift or carry the backsplash flat Always carry or move the backsplash vertically to avoid breakage Page 2
PART LIST A. VANITY – 1pc C. LEFT DOOR – 1pc E. BOLT(3/4") – 4pcs F. HANDLE – 2pcs D. RIGHT DOOR – 1pc G. BOLT(1") – 4pcs B.
FOR YOUR INSTALLATION G F A D ① C ② NOTE: It may be necessary to cut or adjust the level of the inner shelves to allow space for plumbing. E 24H B NOTE: Let the unit stand for 24 hours to allow the silicone to dry completely.
FOR YOUR INSTALLATION NOTE: Vanity needs to be leveled in order to function properly. You may simply adjust the floor levelers after moving the unit to final location. NOTE: If needed for plumbing, simply remove the drawer by pressing the left spring clip upward and right spring clip downward at the same time, then pull the drawer out straight. To reinsert the drawer, compress the slides on the drawer box completely and line them up with the tracks inside the cabinet to slide the drawer back in.
CARE AND MAINTENANCE For Your Stone, For Your Cabinet, • Always keep the stone top dry and clean. Liquid spills need to be blotted up immediately but gently to prevent them from penetrating the surface. • When cleaning, use a dry, soft cloth that will not scratch the surface. • When cleaning the stone top, use neutral soapy water or cleaning product specifically designed for stones with a soft cloth.