Specifications
Electric Starting
1. Ground generator. Never attempt to start the generator set if it is not properly
grounded. Failure to observe this warning could result in serious injury or death
by electrocution. Drive an eight-foot (or longer) ground rod into ground until
clamp on top of ground rod is just above surface. Connect a 6 AWG minimum to
the ground terminal on your generator.
2. Switch main circuit breaker OFF (Never attempt to connect or disconnect load
cables while the generator set is running. Failure to observe this warning could
result in severe personal injury or death by electrocution.)
3. Connect load cables to load terminals
4. Perform the Preventive Maintenance Checks and Services
5. Ensure fuel shut off is in the OPEN position
6. Move the engine RUN lever to RUN position
7. Do not crank engine more that 10 seconds without allowing the starter to cool for
at least 15 seconds between attempted starts. Over cranking can damage the
starter. Turn the START switch clockwise to the START position and release
when the engine has started.
8. If the engine fails to start you can utilize the engine preheater and
decompression leaver.
9. If the engine fails to start repeat steps 6 to 7
10. If the engine still fails to start after two attempts refer to the troubleshooting
guide.
11. Once the engine is running, check any gauges to insure proper operating
conditions. Voltage and Frequency should be correct. Under normal conditions
allow diesel engine to warm up for five minutes before applying a load. If
necessary the load can be applied immediately.
12. Switch the mains circuit breaker to the ON position to apply a load.
AGI6500DE & AGI6500SDE Operator / Owners Manual Version 11.4