Configures the display options. There are ten values that can be associated
with a drawing listed. You can display the information based on your
requirements.
Ribbon: Project tab Project Tools panel Manager.
Toolbar: Main Electrical 2
Menu: Projects Project Project Manager
Command entry: AEPROJECT
On the Project Manager, click the Drawing List Display Configuration tool.
Lists the values that you can associate to a drawing.Display Options
Moves the selected display option into or from the
Current Display Order. To add an option to the list,
Arrow keys
select the display option from the Display Options
list and click the >> button or add all of the options
by clicking the All >> button. To remove an option
from the list, select the option and click the << but-
ton.
Lists the values to display in the listing. You must
have one entry specified.
Current Display Order
Specifies which character to use between the values
in the listing. Type the character in the input box or
use the default (-).
Separator Value
Changes the way the selection highlights in the list-
ing depending on whether the Project Manager is
Always show selection highlight/Show
selection highlight only when active
active or not. By default the drawing file you select
in the drawing list is highlighted at all times; you can
select to only highlight your selection when the Pro-
ject Manager drawing list is active.
Change drawing display options | 173