The Gantt Chart View
The Gantt Chart displays a colored bar chart illustrating your project status.
Each task takes up one row. The horizontal axis represents the time span of
the project, broken down into increments (such as days, weeks, months, and
years) and the vertical axis represents the project tasks. Tasks can run
sequentially, in parallel, or overlapping.
Play Simulations
To play a simulation
1 If the TimeLiner Playback window is not already open, Click Home
tab Tools panel TimeLiner Playback
.
2 Click the Play button on the Simulate tab.
The TimeLiner Playback window displays the tasks as they are carried
out, and the Scene View shows the sections of the model added or
removed over time, in accordance with the task types.
To adjust a simulation playback
1 If the TimeLiner window is not already open, click Home tab Tools
panel TimeLiner
.
2 Click the Simulation tab, and click the Settings button.
3 When the Simulation Settings Dialog Box (page 261) opens, modify the
playback settings, and click OK.