Manual

16
1. Make sure installation area is clean before starting.
2. If the permanent electrical work is not complete, some means of temporary lines
with an on-off device for the power supply should be set up for testing purposes.
3. Place the lift in the installation area.
CAUTION!
When moving the lift, do not attempt to pick it up by the
platform; it is hinged and could be damaged. Pick up the lift
from under the base frame ONLY using a strap sling.
4. Make temporary electrical connections and permanent hydraulic connections.
Raise the lift approximately one foot using the “UP” button. Then lower the lift
back to fully collapse, holding the “DOWN” button for approximately 60 seconds.
Repeat this process five to seven times to bleed any air out of the hydraulic
system.
5. Raise the lift to the top of its travel and make positioning adjustments. Check for
the proper height. If needed, shim to the desired height. DO NOT “spot” shim.
Shim the full length of the base frame. This will prevent the frame from sagging
under an exceptionally heavy load.
DANGER!
Do not work under lift without Maintenance Device! To avoid
personal injury, NEVER go under the lift platform until the load
is removed and the scissors mechanism is securely blocked in
the open position. See "Lift Blocking Instructions" section.
6. The base frame of the lift has pre-drilled holes for lagging it securely to the floor.
Mark the holes, drill, and install with anchors. Lifts with oversize platforms have
minimum pull out requirements of 2,000 lbs. for each anchor.
7. Make permanent electrical connections and operate the lift through a few cycles.
INSTALLATION INSTRUC
TIONS