Manual

21
CYLINDER REPLACEMENT
1. Set the lift in the maintenance position (See LIFT BLOCKING INSTRUCTIONS on
page 13.)
2. Unbolt the two hex head bolts that retain each of the cylinders to the platform.
3. Press and hold the “Down” button to allow the cylinders to retract to a position where
they can be removed from the platform connection.
4. Disconnect electrical power. Always shut off the main electrical switch when
maintenance is to be performed and flollow OSHA lockout-tagout procedures.
5. Disconnect the hydraulic hose from the cylinder.
WARNING!
Do not remove the base clevis pin. This will cause the lift to
collapse!
6. The cylinder can now be pulled out of the base socket and removed.
7. Replace cylinder using same procedure in reverse order.
GENERAL MAINTENANCE