Installation manual
SIMDOS diaphragm metering pump Assembly and connection
KNF Flodos BA_SIMDOS_EN_02_160044.docx
Translation of original operating manual 17
Cutting ring / hose connection fitting with threaded socket
FEM 1.10FT, UFEM 1.10FT
1
Hose
2 Threaded socket
3 Teflon sealing tape
4 Union nut
5 Cutting ring
6 Sealing ring
7 Connector
Fig. 13: 4/6 hose / cutting ring FT connection fitting
1. Remove protective covers from the connections.
2. Screw the threaded socket (2) with Teflon sealing tape (3) into
the pump head.
Do not apply excessive torque to the threaded socket. This
could damage the thread.
3. Using a sharp knife, cut the suction and pressure lines (FEM:
hose with i.d. 4 mm, o.d. 6 mm; UFEM: hose with i.d. 1/8”, o.d.
1/4”) to the required length, with straight square edges.
4. Push the union nut (4), cutting ring (5) and sealing ring (6)
onto the hose (1).
Push the cutting ring and sealing ring over the hose only far
enough for the hose end to protrude around 1 mm.
5. Push the hoses onto the connectors as far as they will go.
6. Hand-tighten the union nut (4).
7. Check that the hoses and hose/connector transitions are
correctly and securely attached.
8. Check the tight seal of the installed fittings.
Fig. 14: Position of cutting ring and
sealing ring on hose