Specifications
viii
Contents
Selecting a Rotor, 2-5
Entering Run Speed, 2-5
Entering Run Time, 2-6
Entering Run Temperature, 2-6
Entering Acceleration and Deceleration Rates, 2-7
Starting a Run, 2-8
Programmed Operation, 2-8
Creating a New Program, 2-8
Starting a Programmed Run, 2-9
Recalling and Changing a Program, 2-10
Recalling a Program, 2-10
Changing a Program, 2-11
CHAPTER 3: Introduction, 3-1
User Messages, 3-1
Accessing the Rotor in Case of Power Failure, 3-4
CHAPTER 4: Introduction, 4-1
Instrument Care, 4-1
Maintenance, 4-1
Cleaning, 4-2
Tube Breakage, 4-3
Decontamination, 4-3
Sterilization and Disinfection, 4-3
Replacing the Air Filter, 4-4
Circuit Breaker and Fuses, 4-5
Storage and Transport, 4-5
Storage, 4-5
Returning a Centrifuge, 4-5
Supply List, 4-5
Replacement Parts, 4-6
Supplies, 4-6
APPENDIX A: Introduction, A-1
Space Requirements
, A-1
Electrical Requirements, A-3
Securing the Centrifuge to the Floor, A-4
Bio-Safety Level 3 Installation, A-4
Beckman Coulter, Inc.
Avanti J-E Centrifuge Warranty
Related Documents










