User's Manual
Installation
6 Issue 1 November 1998
■ Select a mounting location that has adequate ventilation on
all sides of the wallboard to avoid overheating. The
maximum operating temperature is 120°F (49°C).
■ Make sure an electrical outlet is near the wallboard.
■ Any mounting hardware you supply (chains, wall anchors,
“S” hooks, etc.) must be able to support at least four times
the weight of the wallboard.
!
CAUTION:
Do not paint the wallboard to match your office decor. Painting
the wallboard voids the warranty.
!
SECURITY ALERT:
If the wallboard is displaying sensitive BCMS data, be sure to
locate it where only authorized personnel can see the
information.
Wall-Mounted Installation
The list of parts needed and the steps for mounting the wallboard
on a wall are explained below. Unless otherwise stated, the
wallboard includes the parts mentioned.
Required Parts
■ Wallboard
■ Four (4) pivot brackets
■ Eight (8) #8-32 X .375" screws
■ Eight (8) #8-32 lockwashers
■ Two (2) 5/16" 18 X .50" screws
■ Two (2) 5/16" 18 hex nuts










