User's Manual

Installation
6 Issue 1 November 1998
Select a mounting location that has adequate ventilation on
all sides of the wallboard to avoid overheating. The
maximum operating temperature is 120°F (49°C).
Make sure an electrical outlet is near the wallboard.
Any mounting hardware you supply (chains, wall anchors,
“S” hooks, etc.) must be able to support at least four times
the weight of the wallboard.
!
CAUTION:
Do not paint the wallboard to match your office decor. Painting
the wallboard voids the warranty.
!
SECURITY ALERT:
If the wallboard is displaying sensitive BCMS data, be sure to
locate it where only authorized personnel can see the
information.
Wall-Mounted Installation
The list of parts needed and the steps for mounting the wallboard
on a wall are explained below. Unless otherwise stated, the
wallboard includes the parts mentioned.
Required Parts
Wallboard
Four (4) pivot brackets
Eight (8) #8-32 X .375" screws
Eight (8) #8-32 lockwashers
Two (2) 5/16" 18 X .50" screws
Two (2) 5/16" 18 hex nuts