User's Manual
Chapter 2 Configuring and graphing the switch 69
Reference for the Business Policy Switch 2000 Management Software Operations
Figure 28 Chassis, Insert Trap Receive dialog box
2 Type the Index, NetAddr, and the Community information.
3 Click Insert.
Power Supply tab
The Power Supply tab provides read-only information about the operating status
of the switch power supplies.
To open the PowerSupply tab:
1 Select the chassis.
2 From the shortcut menu, choose Edit > Chassis.
The Chassis dialog box opens (Figure 22) with the System tab displayed.
3 Click the PowerSupply tab.
The PowerSupply tab opens (Figure 29).
Note: Refer to Table 22 for description of the Chassis, Insert Trap
Receivers dialog box items.