Instruction Manual

5
Marking Wall For Drill Points
Use the Wall Bracket (A) as a template and
position it on your wall. Ensure the bracket
is level and mark the three DRILL POINTS
with a pencil.
6
Planning & Preparation
Determine the wall type that you have (i.e. Brick/Stud/Plasterboard/Sheetrock).
Ensure the drilling area is free from mains services (Gas/Electric/Water).
Drill three 3mm diameter pilot holes to verify the wall type and select the appropriate fixings
(See Section 7).
Drill points.
A
*
C
Bottom Fixings
E1, 2, 3
F1, 5 ,9, 13
D1
B
E1, 2, 3
*
F2, 6 ,10, 14
Top Fixings
*
C
Bottom Fixings
E1, 2, 3
F2, 6 ,10, 14
D1
N
E1, 2, 3
*
F1, 5 ,9, 13
Top Fixings
Option 2 continuedOption 1 continued
If using screws use Adapter (E1)(F1) & (F2)
If using screws (F5) & (F6) use Adapter (E2)
If using screws (F9) & (F10) use Adapter (E3)
If using screws (F13) & (F14) no Adapter required
*
TV must be parallel to wall. Use spacers / stand-offs as shown.