User's Manual
Table Of Contents
- Eclipse ODU 600 5.8 GHz ISM Band Installation Manual Rev.001
- Copyright & Terms of Use
- Aviat Networks Support
- Eclipse Product Compliance Notes
- Contents
- Volume I: Introduction and Safety
- Volume II: System Overview
- Volume III: Installation
- Chapter 1. Introduction to Installation
- Chapter 2. ODU Installation
- Chapter 3. INU and INUe Installation
- INU/INUe Overview
- Installation Requirements
- Installation Procedure
- Plug-in Installation
- INU/INUe Cable Assemblies
- DAC Trib Connectors and Cables
- NMS Connectors and Cables
- NMS 10/100Base-T Connector
- Maintenance V.24 Connector
- Auxiliary and Alarm Connectors and Cables
- AUX Data Cable: Async, HD26 to Wirewrap, 2 m
- AUX Data Cable: Sync, HD26 to Wirewrap, 2 m
- AUX Data Cable: Async, HD26 to 3 X DB9, 1 m
- AUX Data Cable: Sync, HD26 to 3 X DB9, 1 m
- AUX Data Cable: Async, AUX HD26 to AUX HD26, 1 m
- AUX Data Cable: Sync, AUX HD26 to AUX HD26, 1 m
- AUX Alarm I/O Cable: HD15 to Wirewrap, 2 m or 5 m
VOLUME III, CHAPTER 1, INTRODUCTION TO INSTALLATION
Installation Tools and Materials
Ensure you have the following tools and material before going to site. These are
items to be sourced/supplied by the installer.
The items are indicative for standard installations. For non-standard installations
additional materials and tools may be required.
Table 1-1. Required Tools and Material
Equipment Tool/Material Description
Antenna
As required by the
manufacturer/supplier
Refer to the manufacturer’s data supplied with each antenna
for required and recommended installation tools and
equipment. (Aviat Networks offers antennas from several
suppliers).
Eclipse Radios
Basic electrician’s toolkit The kit must include a crimp lugs, a crimp tool for attaching the
lugs to stranded copper cable, a multimeter.
Torque wrench Capable of 66 N-m or 50 ft-lb, with a selection of sockets for
antenna mount fastening
Hot-air gun For use on the heat-shrink tubing.
Protective grease and
zinc-rich paint
For weather-protecting grounding attachment points on towers
and grounding bars.
4mm
2
(#12) green PVC
insulated strand copper
wire and grounding lugs
For grounding the indoor unit to the rack/frame
16 mm
2
(#6) green PVC
insulated strand copper
wire and grounding lugs
For grounding the rack to the station ground.
Unpacking
To unpack Eclipse equipment:
l Open the shipping boxes, carefully remove the equipment and place it on a
clean, flat working surface.
l Ensure all the basic components and accessories for your system have been
included in the shipment by comparing the packaging, component part
numbers and product descriptions against the packing list, and cross-checking
against the installation datapack for the system to be installed.
l If there has been shipping damage or there are discrepancies between the
equipment expected and the equipment received, contact an Aviat Networks
Help Desk or your supplier.
42 AVIAT NETWORKS