User's Manual
Table Of Contents
- Eclipse ODU 600 5.8 GHz ISM Band Installation Manual Rev.001
- Copyright & Terms of Use
- Aviat Networks Support
- Eclipse Product Compliance Notes
- Contents
- Volume I: Introduction and Safety
- Volume II: System Overview
- Volume III: Installation
- Chapter 1. Introduction to Installation
- Chapter 2. ODU Installation
- Chapter 3. INU and INUe Installation
- INU/INUe Overview
- Installation Requirements
- Installation Procedure
- Plug-in Installation
- INU/INUe Cable Assemblies
- DAC Trib Connectors and Cables
- NMS Connectors and Cables
- NMS 10/100Base-T Connector
- Maintenance V.24 Connector
- Auxiliary and Alarm Connectors and Cables
- AUX Data Cable: Async, HD26 to Wirewrap, 2 m
- AUX Data Cable: Sync, HD26 to Wirewrap, 2 m
- AUX Data Cable: Async, HD26 to 3 X DB9, 1 m
- AUX Data Cable: Sync, HD26 to 3 X DB9, 1 m
- AUX Data Cable: Async, AUX HD26 to AUX HD26, 1 m
- AUX Data Cable: Sync, AUX HD26 to AUX HD26, 1 m
- AUX Alarm I/O Cable: HD15 to Wirewrap, 2 m or 5 m
VOLUME III, CHAPTER 2, ODU INSTALLATION
Figure 2-6. Andrew ODU Collar and Polarization Rotator
ODU Polarization
The ODU must be mounted on the collar to match the chosen polarization. Correct
positioning for vertical or horizontal polarization is shown:
Figure 2-7. ODU 600 Orientation for Vertical and Horizontal Polarization
The ODU should be mounted with I ts connectors facing down.
Direct-Mount ODU Attachment Procedure
This topic describes the physical attachment of an ODU to an antenna mounting col-
lar.
Related procedures are:
l Installing the ODU Lightning Surge arrestor; refer to See "Installing Lightning
Surge Arrestors". This is only required for ODUs not fitted with an internal
lightning surge arrestor.
l Grounding an ODU; refer to See "Grounding the ODU"
52 AVIAT NETWORKS