3.0
Table Of Contents
- Avid iNEWS Command Installation and Configuration Guide
- Contents
- Using This Guide
- Installing and Configuring the Command Server
- System Architecture
- Checklist: Before you Begin
- Checklist: Command Server Installation
- Copying Install CD to Local Directory
- Installing Avid Service Framework
- Installing the License Service
- Installing Avid iNEWS Command on the Server
- Configuring the iNEWS Command Server
- Configuring a Second Command System
- Installing and Configuring the AirSpeed Video Servers
- Checklist: Installing the AirSpeed Video Server
- Installing Avid Service Framework
- Installing AirSpeed Multi Stream Device Services
- Checklist: Configuring the AirSpeed Video Server
- Configuring Properties for Interplay Workgroup
- Configuring the AirSpeed Multi Stream Device Service
- Configuring Properties for Command Workgroup
- Working with Play While Record
- AirSpeed Multi Stream Los-Res Proxy Viewer
- Installing and Configuring the Deko
- System Architecture
- Checklist: Installing the Deko
- Installing Avid Service Framework
- Installing Avid Deko Device Service
- Installing the DekoMOS Gateway
- Installing the DekoMOS Macro Server
- Checklist: Configuring the Deko
- Configuring the DekoMOS Gateway
- Configuring the DekoMOS Macro Server
- Configuring Avid Workgroup Properties
- Configuring the Deko Device Service
- Configuring the Avid Deko Renderer Service
- Creating Graphic Styles in Command
- Installing and Configuring the Graphic Device Service
- Installing Avid Service Framework
- Installing Avid Graphic Device Service
- Installing Third-Party Plug-ins for the Graphic Device Service
- CII Integration
- Installing and Configuring the Thunder
- Installing the Command Workstation
- Installing and Configuring the Tablet Application
- Configuring Playout Control
- Controling Playout via the Keyboard
- Disabling a Command Workstation’s Keyboard
- Checklist: Setting up an X-keys USB Keypad
- Installing an X-keys USB Keypad
- Mapping Indices to Channel Names
- Programming the X-keys
- Setting up the Playout Panel for Touch Screens
- Checklist: Setting up the GPI Panel
- Configuring the GPI Card
- Restarting the GPI Device Service
- Confirming Successful Setup of a GPI Panel
- Mapping Events to Actions for a GPI Panel
- Enabling the GPI Panel
- Configuring GPI Out
- Integrating with Avid iNEWS
- Integrating with ENPS
- Configuring the Perle IOLAN Server
- Confirming Functionality
- Index
11 Configuring the Perle IOLAN Server
276
g. Click OK.
12. Click the Advanced tab and confirm the following options are set accordingly:
- Return when connection is fully establish should be selected.
- The maximum wait time should be set to five (5) seconds.
- Send keep alive packets should not be selected.
13. Click the Packet Forwarding tab, select Enable Packet Forwarding, and set the Idle Time
to 10 milliseconds.
14. Click the Copy Settings To button and copy the settings to the remaining COM ports.
15. Click OK to save and exit. You might be asked to restart the computer.
After you have completed these steps, you can proceed with wiring serial cables
between the video device and the IOLAN server, and configure the Avid Video device
service for serial connection.
Wiring for IOLAN to Video Server
The following illustration is the wiring diagram for the IOLAN server to video device.
The lines in the diagram are colored only to show the connections; they do not correspond to
any wire colors on an RJ45 cable. If you are using DB9 connectors, the inside of the RJ45
side of the connetor’s wires are counted from 8 to 1, with the connecting tab on top. The
connector’s wire colors are never consistent either, so Avid strongly recommends that you
use a volt meter to confirm the correct color wire for the 2, 4, 5, and 7 pins of the RJ45 cable,
and then plug them into their appropriate place on the DB9 connector.