5.0
Table Of Contents
- Avid iNEWS User's Guide
- Contents
- Using This Guide
- iNEWS System
- Getting Started
- The iNEWS Workspace
- Toolbars
- Working with Queues
- Changing Forms for Viewing Queues
- Changing the Width of a Queue Form Field
- Easy Locking a Queue
- Key Locking a Queue
- Moving a Queue
- Opening a Queue
- Refreshing a Queue
- Searching for Text in a Queue
- Specifying a Destination Queue
- Unlocking a Queue
- Using Abstract Display in Queue
- Using Currency Total
- Viewing Queue Properties
- Working with Wires
- Stories - Creation and Modification
- Moving Stories
- Stories - Protection
- iNEWS Projects
- Scripted Stories
- Displaying a Production Cue
- Enabling Autoscript
- Adding a Production Cue to a Story
- Adding a CG Production Cue
- Adding a Video Production Cue
- Adding a Still Store Production Cue
- Moving a Production Cue
- Deleting a Production Cue
- Using Script Templates
- Using CG Title Entry
- Primary Machine Control Event Placeholder
- Using MOS Placeholders
- Unscripting a Story
- Production Tasks
- Producer Basics
- Endorsing a Story
- Inserting a Break Line
- Ordering a Queue
- Calculating Backtime from Out Time
- Displaying the Show Timing Clocks
- Establishing Broadcast Control in a Queue
- Loading a Rundown Queue into Broadcast Control
- Placing a Rundown Queue in Show Timing Mode
- Production Locking a Queue
- Setting Clock for Show Timing
- Setting Story Start Times in a Rundown Queue
- Synchronizing a Story
- Synchronizing the First Story
- Synchronizing a Rundown Queue During Broadcast
- Timing Story Text
- Timing a Show
- Floating a Story
- Tracking a Show
- Printing
- Messages and Mail
- Sessions and Preferences
- Macros
- Searching in iNEWS
- Local Databases
- Connecting to a Remote Service
- System Shortcuts
- Icons
- Glossary
- Index
Creating Projects
114
For more information about the options for date variables, see “Date Variables for
Searching” on page 114
.
Maximum hits can also be set in the Set Query String dialog box.
6. Click OK. Your search criteria is saved and the Set Query String dialog box closes.
7. In the Create New Project/Facet dialog box, continue the configuration by setting a read
group, if any. The default is ! <none>. If set to ! <none>, no read group is defined; therefore,
no restriction is applied to the project, so all users will be able to see the project and its
facets.
8. Set the start and end date, if necessary. These dates define the date range in which the project
appears in iNEWS Workstations. Projects will no longer appear after midnight (00:00) on
the morning of the end date. Projects cannot have an end date prior to the start date.
n
Users can view expired projects and facets by right-clicking on one and selecting Show Expired
Projects.
9. Define which forms should be used for the ALL, BUCKET, and QUERY queues.
10. The Notify Users box defines who receives notifications when project stories are added or
modified. These notifications appear in the status bar of iNEWS Workstations. As the
project administrator creating the project, you can select individual users or groups of users
to add to the Notify Users list, but after the project is created, users with read access to the
project can subscribe to receive notifications by right-clicking on the project in the Directory
panel.
11. After you’ve completed setting up your project, click OK to save it. The project will appear
on the Project tab in the Directory panel.
Date Variables for Searching
The options for searching by date are documented in more detail in the following table:
Option Description
Today Range = 00:00:00 through 23:59:59 of present day
Tomorrow Range = 00:00:00 through 23:59:59 of tomorrow
Yesterday Range = 00:00:00 through 23:59:59 of yesterday
Next Week Range = 00:00:00 of next Sunday through 23:59:59 of next Saturday
This Week Range = 00:00:00 of this Sunday through 23:59:59 of this Saturday
Last Week Range = 00:00:00 of prior Sunday through 23:59:59 of prior Saturday