5.0
Table Of Contents
- Avid iNEWS User's Guide
- Contents
- Using This Guide
- iNEWS System
- Getting Started
- The iNEWS Workspace
- Toolbars
- Working with Queues
- Changing Forms for Viewing Queues
- Changing the Width of a Queue Form Field
- Easy Locking a Queue
- Key Locking a Queue
- Moving a Queue
- Opening a Queue
- Refreshing a Queue
- Searching for Text in a Queue
- Specifying a Destination Queue
- Unlocking a Queue
- Using Abstract Display in Queue
- Using Currency Total
- Viewing Queue Properties
- Working with Wires
- Stories - Creation and Modification
- Moving Stories
- Stories - Protection
- iNEWS Projects
- Scripted Stories
- Displaying a Production Cue
- Enabling Autoscript
- Adding a Production Cue to a Story
- Adding a CG Production Cue
- Adding a Video Production Cue
- Adding a Still Store Production Cue
- Moving a Production Cue
- Deleting a Production Cue
- Using Script Templates
- Using CG Title Entry
- Primary Machine Control Event Placeholder
- Using MOS Placeholders
- Unscripting a Story
- Production Tasks
- Producer Basics
- Endorsing a Story
- Inserting a Break Line
- Ordering a Queue
- Calculating Backtime from Out Time
- Displaying the Show Timing Clocks
- Establishing Broadcast Control in a Queue
- Loading a Rundown Queue into Broadcast Control
- Placing a Rundown Queue in Show Timing Mode
- Production Locking a Queue
- Setting Clock for Show Timing
- Setting Story Start Times in a Rundown Queue
- Synchronizing a Story
- Synchronizing the First Story
- Synchronizing a Rundown Queue During Broadcast
- Timing Story Text
- Timing a Show
- Floating a Story
- Tracking a Show
- Printing
- Messages and Mail
- Sessions and Preferences
- Macros
- Searching in iNEWS
- Local Databases
- Connecting to a Remote Service
- System Shortcuts
- Icons
- Glossary
- Index
Creating Facets
116
The Create New Project/Facet dialog box appears with some information already filled in
and displayed as read only.
For instance, the following example shows the dialog box as it would appear when creating a
new facet for a project called Elections.
4. Type the name of the facet in the Facet field. Facet names can be up to 40 characters in
length and can contain spaces, hyphens (-), or ampersands (&), but they cannot contain
periods.
5. Set the start and end date, if necessary. These dates define the date range in which the facet
appears in iNEWS Workstations. Facets will no longer appear after midnight (00:00) on the
morning of the end date. Facets cannot have an end date prior to the start date. Facets also
cannot have start or end dates beyond those defined by their parent projects.
n
Users can view expired projects and facets by right-clicking on one and selecting Show Expired
Projects.