4.7
Table Of Contents
- Avid® ISIS® | 2500 Setup Guide
- Contents
- Chapter 1 Avid ISIS | 2500 System Overview 14
- Chapter 2 Connecting the ISIS Equipment 32
- Chapter 3 Preupgrade Information 64
- Chapter 4 Upgrade Guidelines 68
- Chapter 5 Installing Software and Configuring the System 80
- Chapter 6 Configuring System Director Failover 92
- Chapter 7 Avid ISIS Software Licensing 102
- Chapter 8 Avid ISIS Recommended Maintenance 109
- Chapter 9 Status LEDs and Error Messages 115
- Chapter 10 Adding and Replacing Hardware 130
- Chapter A Using the Product Recovery USB for 64-bit System Directors 156
- Chapter B Specifications and Notices 160
- Appendix C Safety and Regulatory Information 166
- Using This Guide
- Avid ISIS | 2500 System Overview
- Connecting the ISIS Equipment
- Rack Mounting the Equipment
- Opening and Closing the Media Drive Drawers
- Installing the Media Drives
- Installing the Cooling Modules
- Installing the Power Supplies
- Installing the Engine Controller
- Connecting Power to Equipment
- Connecting a Keyboard, Monitor, and Mouse
- Setting Up the Network Address On the Engine
- Connecting Network Cables with a 1 Gb System Director Connection
- Connecting Network Cables with a 10 Gb System Director Connection
- Preupgrade Information
- Upgrade Guidelines
- Installing Software and Configuring the System
- Software Installation
- Configuration Overview
- Loading the Software
- Separate VLAN on Switch for ISIS | 2500
- Activating the License Key
- Creating an Active File System on the System Director
- Installing Software on the Engine
- Binding the Storage Managers
- Creating a Storage Group
- Creating Workspaces
- Creating User Accounts
- Turning Off the CIFS Service With a 1 Gb Connected System Director
- Checking the Status of the System Director
- Software Installation
- Configuring System Director Failover
- Avid ISIS Software Licensing
- Avid ISIS Recommended Maintenance
- Status LEDs and Error Messages
- Adding and Replacing Hardware
- Using the Product Recovery USB for 64-bit System Directors
- Specifications and Notices
- Safety and Regulatory Information
- Warnings and Cautions
- Proposition 65 Warning
- FCC Notice
- Canadian Notice (Avis Canadien)
- LED Safety Notices
- European Union Declaration of Conformity
- Disposal of Waste Equipment by Users in the European Union
- Argentina Conformity
- Australia and New Zealand EMC Regulations
- Japan EMC Regulations
- Korean EMC Regulations
- Taiwan EMC Regulations
- Index
Configure a Failover Connection
95
3. Click Stop System Director.
4. Click Change Virtual System Director Name and type a name in the Virtual System Director
Name text box, then click OK.
n
You must assign the same virtual name to both System Directors.
5. (First new System Director) Select Create Active File System and click OK.
c
If you already have a running System Director do not create a new file system. If you create
a new file system on a System Director that already has a file system all of your existing
data will be lost.
The Avid ISIS System Director service automatically starts when complete. In the System
Director Control Panel, the “System Director is running” display turns green.
6. Click Stop System Director.