2.1.1

Table Of Contents
2 Connecting the ISIS Equipment
This chapter explains how to rackmount and connect the system hardware. To do this, a
system installation check list is provided to help you perform the installation in the correct
order. The installation check list continues past the information in this chapter and points
you to the correct area in this document or the ReadMe file to continue the installation.
This chapter contains the following information:
Rack-Mounting the Equipment
Installing Blades and Power Supplies
Connecting Power to Equipment
Connecting the Application Key
Connecting an Engine with v2.x Hardware
Connecting an Engine with v1.x Hardware
n
For information on connecting and configuring two System Directors for failover, see
“Configuring the System for Failover” on page 109.
Rack-Mounting the Equipment
This chapter describes how to install and connect the System Director and other workgroup
hardware.
c
Information concerning power, airflow, and dimensions are explained completely in the
Avid Products and Network Site Preparation Guide located on the documentation DVD.
You should understand the basic power configurations explained in “Connecting
Power to Equipment” on page 56.
c
Before you start the procedures in this chapter, you should be familiar the previous
chapters in this document.